翻訳と辞書 |
Geothermal power in Turkey : ウィキペディア英語版 | Geothermal power in Turkey Geothermal power in Turkey began in the 1970s in a prototype plant following systematic exploration of geothermal fields. In the 1980s, a first power plant has grown up out of the pilot facility. The small-sized geothermal power plant was expanded to the country's biggest one in 2013. Currently, two power plants operate in Turkey. Its theoretical geothermal potential is 60GW and potential is 4.5GW 〔(【引用サイトリンク】url=http://climatepolicyinitiative.org/publication/public-finance-and-private-exploration-in-geothermal-gumuskoy-case-study-turkey/ )〕 In addition to electric power generation, geothermal heat is used directly. ==Geology== The high geothermal potential is due to geology such as the Western Anatolian Graben systems. However "many of Turkey’s existing geothermal plants are situated on reservoirs where the carbon content of non-condensable gases (NCGs) in the geothermal fluids are high",〔 therefore care must be taken to avoid excessive carbon emissions.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Geothermal power in Turkey」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|